Interactive explainers
Two small tools that make the key ideas concrete.
Odds against money spent
Move along the path to see how the chance of a mine, the money spent and the drilling change from step to step.
Stage 3: Maiden resource
Maiden resource
First resource estimate signed by a qualified person. Mostly Inferred, sometimes with Indicated where drilling is denser.
- Chance of becoming a mine
- About 15% (1 in 7)
- Spent so far (cumulative)
- About $10M
- +$7M since discovery: drilling ~$6M, assays and estimate ~$1M
- Drilling
- 10,000–50,000 m at about 80–200 m spacing
- Typical funders
- Junior explorers: the start of the funding gap
Show as a table
| Milestone | Chance of a mine | Spent so far (cumulative) | Drilling |
|---|---|---|---|
| Grassroots exploration | About 0.1% (1 in 1,000) | About $0.3M Starting spend: mapping, sampling, geophysics | None yet |
| Discovery drilling | About 3% (1 in 30) | About $3M +$3M since grassroots: drilling ~$2M, surveys and access ~$1M | 2,000–5,000 m, scattered target holes |
| Maiden resource | About 15% (1 in 7) | About $10M +$7M since discovery: drilling ~$6M, assays and estimate ~$1M | 10,000–50,000 m at about 80–200 m spacing |
| Preliminary economic assessment (PEA) published | About 30% (1 in 3) | About $20M +$10M since the maiden resource: drilling ~$8M, metallurgy ~$1M, PEA study ~$1M | Infill toward about 40–100 m spacing, first metallurgy |
| Pre-feasibility study (PFS) published: Probable reserves | About 45% (about 1 in 2) | About $40M +$20M since the PEA: drilling ~$10M, testwork and environment ~$5M, PFS study ~$5M | Indicated spacing, plus geotechnical, hydrogeology and condemnation holes |
| Feasibility study (FS) published: Proven reserves | About 65% (2 in 3) | About $70M +$30M since the PFS: drilling ~$10M, testwork and permits ~$5M, FS study ~$15M | About 15–50 m spacing in the early mine plan |
| Construction decision | About 85% | About $120M +$50M since the FS: early engineering and orders ~$30M, permits and community ~$10M, financing ~$10M | Mostly complete; some grade-control and near-mine drilling |
| Construction | About 95% | About $500M +$380M since the build decision: plant ~$200M, mine and fleet ~$100M, power, water and tailings ~$80M | Grade control and near-mine exploration |
| Producing mine | It is a mine | About $1B +$500M during the build: rest of construction ~$400M, ramp-up and working capital ~$100M | Ongoing grade control and reserve replacement |
Tonnes times grade
Contained metal is a starting point, not a valuation. Change the inputs to see why.
Contained gold
482,261 oz
10 Mt × 1.5 g/t ÷ 31.1035 g per troy ounce
- Value in the ground$965M
- After recovery losses$868M
- After operating costs$368M
Only about 38% of the in-ground value is left after recovery and operating costs, and that is before capital cost, tax, royalties and the time value of money.